Log out
AA
First
Last
Back

Scott Pavely

Project Engineer
Request to Book

Availability

Get in touch with us to get real-time availability for
Scott
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1250
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

5
years

Education

MSc (Eng) | 2019 to 2020
Masters in Engineering Project Management
University of Leeds
Grade: Distinction

BEng (Hons) | 2015 to 2019
Bachelors in Civil Engineering SW
Nottingham Trent University
Grade: First Class Honours

Qualifications

BEng
MEng

Software Familiarity

Navisworks
Aconex

References

No items found.

Day Rate

$
1250
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

5
years

Recent Activity

About

A safety-conscious and disciplined engineer who is technically minded, proactive, has strong interpersonal skills who can communicate efficiently. I am a driven individual with a ‘can do’ attitude and have a passion for major infrastructure projects. I am experienced in highways, rail, defence, industrial ports, and high-speed rail infrastructure delivery. I have sound knowledge of design, quality assurance, project management and safety. I am seeking a challenging project engineer position and relocating to Australia in Q4 2024 on a 417 working holiday visa.

Core Skills

  • Project Management
  • Design Coordination
  • AutoCAD
  • Temporary Works
  • Technical / Setting Out
  • Health and Safety
  • Contractual Knowledge
  • Leadership
  • Verbal Communication

Skills

Civil Engineering
Design coordinator
Earthworks
Temporary works
Staging & Methodology
Traffic Management
Waste water

Scott

's Project Experience

Senior Engineer – VolkerFitzpatrick Ltd | November 2023 - Nov 2024

HS2 Old Oak Common – West London - £60 million: Old Oak Common Lane road lowering and utility diversions via an under track crossing (UTX) including Thames Water trunk mains, gas, electric and telecoms.

  • Led the temporary works designs for the utility investigations and produced design briefs for the UTX tunnel reception pits, connection trial holes on the road and bulk excavations.
  • Appointed as the temporary work supervisor, leading the implementation of various unique temporary works designs including deep excavations, king post walls and utility propping.
  • Produced scoping documents to allow suppliers to tender for the works.
  • Reviewed supplier’s quotations for implementation of the investigation works and provided support to the commercial team in managing costs and maximising engineering efficiencies.
  • Managed subcontractors works and mitigated interfaces with other disciplines on the project by producing lookahead programmes.
  • Mentored project and junior engineers.

Civils Consultant (Secondment) – Atkins | May 2023 - November 2023

Based in London Victoria, Nova North. Single option development design for two railway stations as part of Network Rails CP7 Wales and Western.

  • Developed and coordinated civil design models to input into the federated model. Software: Bentley MicroStation and ProjectWise.
  • Produced design drawings with the aid of an CAD technician and Network Rail standard drawings.
  • Prepared budgets for civil design consultancy services for clients. Monitored costs for the civils team budget analysing actual cost versus forecasted.

Section Engineer – VolkerFitzpatrick Ltd | October 2022 - May 2023

East West Rail Project – Winslow Station - £4.7 million: Ancillary civils works included drainage, ducting, highways, precast retaining walls, fencing and RC foundations. Together with building works and footbridge/lift shaft installation.

  • Led design coordination meetings and identified discrepancies between the works information (design drawings, specification, and standard details).
  • Raised buildability issues before works commenced onsite and communicated these via a technical query (TQ) / request for change to the client’s principal designer.
  • Produced four-week lookahead programmes to meet budgets.
  • Mentored junior engineers and acted as their line manager contributing to their development.
  • Ensured works are planned in accordance to rail HSEQ procedures by writing task briefings, works package plans and inspection test plans (ITPs).
  • Responsible for the commercial success of the project and raised early warnings and compensation events when change occurred.

Section Engineer – ALIGN JV | September 2021 - October 2022

HS2 C1: Colne Valley Viaduct Rotary and CFA Piling Package – Rickmansworth - £36.19 million

Site Engineer - VolkerFitzpatrick Ltd | June 2019 - August 2021

F35 Beddown Programme - RAF Lakenheath - £180 million

Industrial Training Placement Engineer - VolkerFitzpatrick Ltd | July 2017 - August 2018

  • Berth 9 Extension Project – Port of Felixstowe - £32 million
  • Ely Southern Bypass Stage 2 – Cambridgeshire - £50 million
  • Collaborative Deliveries Framework Package 1 – Bedfordshire - £15 million

Availability

Get in touch with us to get real-time availability for
Scott
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1250
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

5
years

Education

MSc (Eng) | 2019 to 2020
Masters in Engineering Project Management
University of Leeds
Grade: Distinction

BEng (Hons) | 2015 to 2019
Bachelors in Civil Engineering SW
Nottingham Trent University
Grade: First Class Honours

Qualifications

BEng
MEng

Software Familiarity

Navisworks
Aconex

References

No items found.

Day Rate

$
1250
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

5
years

Recent Activity

About

A safety-conscious and disciplined engineer who is technically minded, proactive, has strong interpersonal skills who can communicate efficiently. I am a driven individual with a ‘can do’ attitude and have a passion for major infrastructure projects. I am experienced in highways, rail, defence, industrial ports, and high-speed rail infrastructure delivery. I have sound knowledge of design, quality assurance, project management and safety. I am seeking a challenging project engineer position and relocating to Australia in Q4 2024 on a 417 working holiday visa.

Core Skills

  • Project Management
  • Design Coordination
  • AutoCAD
  • Temporary Works
  • Technical / Setting Out
  • Health and Safety
  • Contractual Knowledge
  • Leadership
  • Verbal Communication

Skills

Civil Engineering
Design coordinator
Earthworks
Temporary works
Staging & Methodology
Traffic Management
Waste water

Scott

's Project Experience

Senior Engineer – VolkerFitzpatrick Ltd | November 2023 - Nov 2024

HS2 Old Oak Common – West London - £60 million: Old Oak Common Lane road lowering and utility diversions via an under track crossing (UTX) including Thames Water trunk mains, gas, electric and telecoms.

  • Led the temporary works designs for the utility investigations and produced design briefs for the UTX tunnel reception pits, connection trial holes on the road and bulk excavations.
  • Appointed as the temporary work supervisor, leading the implementation of various unique temporary works designs including deep excavations, king post walls and utility propping.
  • Produced scoping documents to allow suppliers to tender for the works.
  • Reviewed supplier’s quotations for implementation of the investigation works and provided support to the commercial team in managing costs and maximising engineering efficiencies.
  • Managed subcontractors works and mitigated interfaces with other disciplines on the project by producing lookahead programmes.
  • Mentored project and junior engineers.

Civils Consultant (Secondment) – Atkins | May 2023 - November 2023

Based in London Victoria, Nova North. Single option development design for two railway stations as part of Network Rails CP7 Wales and Western.

  • Developed and coordinated civil design models to input into the federated model. Software: Bentley MicroStation and ProjectWise.
  • Produced design drawings with the aid of an CAD technician and Network Rail standard drawings.
  • Prepared budgets for civil design consultancy services for clients. Monitored costs for the civils team budget analysing actual cost versus forecasted.

Section Engineer – VolkerFitzpatrick Ltd | October 2022 - May 2023

East West Rail Project – Winslow Station - £4.7 million: Ancillary civils works included drainage, ducting, highways, precast retaining walls, fencing and RC foundations. Together with building works and footbridge/lift shaft installation.

  • Led design coordination meetings and identified discrepancies between the works information (design drawings, specification, and standard details).
  • Raised buildability issues before works commenced onsite and communicated these via a technical query (TQ) / request for change to the client’s principal designer.
  • Produced four-week lookahead programmes to meet budgets.
  • Mentored junior engineers and acted as their line manager contributing to their development.
  • Ensured works are planned in accordance to rail HSEQ procedures by writing task briefings, works package plans and inspection test plans (ITPs).
  • Responsible for the commercial success of the project and raised early warnings and compensation events when change occurred.

Section Engineer – ALIGN JV | September 2021 - October 2022

HS2 C1: Colne Valley Viaduct Rotary and CFA Piling Package – Rickmansworth - £36.19 million

Site Engineer - VolkerFitzpatrick Ltd | June 2019 - August 2021

F35 Beddown Programme - RAF Lakenheath - £180 million

Industrial Training Placement Engineer - VolkerFitzpatrick Ltd | July 2017 - August 2018

  • Berth 9 Extension Project – Port of Felixstowe - £32 million
  • Ely Southern Bypass Stage 2 – Cambridgeshire - £50 million
  • Collaborative Deliveries Framework Package 1 – Bedfordshire - £15 million